Remodeling
Most kitchens take 3–6 weeks and bathrooms 2–4 weeks, depending on scope, materials, and whether walls or utilities are being moved.
No. Our own crew handles every trade — demolition, plumbing, electrical, tile, and finishes — so you have one accountable team.
Most families stay home. We set up dust barriers and keep a temporary kitchen area available whenever possible.
Painting
Interior rooms usually take 1–2 days each; most exterior homes take 3–5 days depending on prep and weather.
We work with premium Benjamin Moore and Sherwin-Williams products and can match any existing color.
Exterior work runs during the warmer months when temperatures allow proper curing. Interior painting is available year-round.
Carpentry
Wood offers classic beauty at a lower cost; composite needs almost no maintenance and resists fading. We will help you compare both.
Most decks take 1–3 weeks depending on size, height, and material lead times.
Yes. We refinish treads, risers, and railings, and repair creaks, wobbles, and loose handrails to make existing stairs safe and beautiful.
Kitchen Remodeling
Most kitchens take 3–6 weeks depending on scope, materials, and whether walls or utilities are being moved.
Most families stay home. We set up dust barriers and keep a temporary kitchen area available whenever possible.
Yes. We can install materials you have purchased, or source everything for you at contractor pricing.
Bathroom Remodeling
A typical full bathroom takes 2–4 weeks. Smaller refreshes can be completed in about a week.
Yes. We manage the complete scope, including plumbing rough-in, electrical, and any required inspections.
Absolutely. Tub-to-shower conversions are one of our most requested upgrades and a great option for aging in place.
Interior Painting
Interior rooms usually take 1–2 days each, including prep, priming, and two finish coats.
Yes. Patching, skim coating, and trim repair are part of our interior painting service so the finish is seamless.
Yes. We work with premium Benjamin Moore and Sherwin-Williams products and can match any existing color.
Exterior Painting
Most exterior homes take 3–5 days depending on prep, weather, and the size of the home.
Yes. We repair wood, stucco, and trim before painting so the coating has a sound surface to bond to.
We paint exteriors during the warmer months when temperatures allow proper adhesion and curing.
Deck Construction
Wood offers classic beauty at a lower cost; composite needs almost no maintenance and resists fading. We will help you compare both.
Most decks take 1–3 weeks depending on size, height, and material lead times.
Usually yes. We handle the permit process and build to local code so your deck passes inspection.
Stair Construction
Yes. We sand, stain, and seal treads, paint risers, and repair creaks, wobbles, and loose handrails to make existing stairs look brand new.
Most stair refinishing projects take 2–4 days, depending on the number of flights and the condition of the wood.
Creaks are usually cosmetic, but they can hide loose stringers or failing fasteners. We inspect the structure and repair any real problem we find.